site coordinator


  • Site Supervised & inspect progress work on site and physical site works.
  • Discussed site matters with related parties & resolved site issues.
  • Prepared site daily report and compile site progress report.
  • Attend site meeting ( subject to project requirement)
  • Liaise with customer for arrangement coordinate.
  • Other ad-hoc duties as assigned from time to time.
  • Monitoring of daily site activities including co ordination with sub-contractors, supplier, etc.
  • Conduct site survey and measurement work
  • To ensure projects meets the stipulated quality requirements by closely monitoring & supervising the work of the subcontractor.

  1. To be aware on material usage at site and wastage control.
  2. Responsible for the supervision and monitoring of work construction in accordance with the contract and the construction drawings especially in respect of specification, quality and time completion.
  3. Ensure that procedures outlined in the Project Quality Plan (PQP) and the company’s Quality Management System Manual is adhered to during supervision and monitoring.
  4. Inspect and monitoring at all times each stage of the construction works including piling, structural and architectural works, mechanical and electrical work, external works and infrastructure works.
  5. Identify all remedial/outstanding works to be carried out and to ensure that those works are carried out by the contractor within the time stipulated in the contracts
  6. Upon completion of work, to carry out final inspection and handovers
  7. Control all relevant project documents and data as per procedure stated in the PQP


  • To manage local projects at site to include project scheduling, implementation, control, reporting, resolving disputes and problems at site and all matters to ensure the smooth completion of the project.
  • PC is expected to move from project to project which length of stay is dependent on the duration of the project
  • To coordinate with developers and main contractor, sub contractor, installer, supplier, factory, logistic agents and any parties related to the project to ensure the smooth implementation of the project.
  • To ensure on time completion of installation of kitchen cabinet/wardrobe for all projects secured as per contract.
  • To be able to work independently and must have initiative and creative in drawing up proposal to client and management.
  • To take detail note and responsible in controlling project site material usage and keeping.
  • To attend all site meeting and follow up services with client
  • To plan and coordinate manpower requirement for daily on-going projects.
  • To ensure quality finishing for all installations.
  • To submit regular report and forms to management
  • Other functions related to site upon instruction of management