- Site Supervised & inspect progress work on site and physical site works.
- Discussed site matters with related parties & resolved site issues.
- Prepared site daily report and compile site progress report.
- Attend site meeting ( subject to project requirement)
- Liaise with customer for arrangement coordinate.
- Other ad-hoc duties as assigned from time to time.
- Monitoring of daily site activities including co ordination with sub-contractors, supplier, etc.
- Conduct site survey and measurement work
- To ensure projects meets the stipulated quality requirements by closely monitoring & supervising the work of the subcontractor.
- To be aware on material usage at site and wastage control.
- Responsible for the supervision and monitoring of work construction in accordance with the contract and the construction drawings especially in respect of specification, quality and time completion.
- Ensure that procedures outlined in the Project Quality Plan (PQP) and the company’s Quality Management System Manual is adhered to during supervision and monitoring.
- Inspect and monitoring at all times each stage of the construction works including piling, structural and architectural works, mechanical and electrical work, external works and infrastructure works.
- Identify all remedial/outstanding works to be carried out and to ensure that those works are carried out by the contractor within the time stipulated in the contracts
- Upon completion of work, to carry out final inspection and handovers
- Control all relevant project documents and data as per procedure stated in the PQP
- To manage local projects at site to include project scheduling, implementation, control, reporting, resolving disputes and problems at site and all matters to ensure the smooth completion of the project.
- PC is expected to move from project to project which length of stay is dependent on the duration of the project
- To coordinate with developers and main contractor, sub contractor, installer, supplier, factory, logistic agents and any parties related to the project to ensure the smooth implementation of the project.
- To ensure on time completion of installation of kitchen cabinet/wardrobe for all projects secured as per contract.
- To be able to work independently and must have initiative and creative in drawing up proposal to client and management.
- To take detail note and responsible in controlling project site material usage and keeping.
- To attend all site meeting and follow up services with client
- To plan and coordinate manpower requirement for daily on-going projects.
- To ensure quality finishing for all installations.
- To submit regular report and forms to management
- Other functions related to site upon instruction of management